LCDS on two-way cycleways across junctions

For two-way tracks crossing two-way side roads, ‘bending-out’ by 5 metres is the recommended option. Where island separation is wide, this can be achieved with little or no deviation of the cycle track. Continuing a two-way track through a priority junction without deviation is possible, but brings with it various risks, related to the visibility of cyclists to turning motorised traffic. It is not recommended unless traffic speeds and volumes are very low and other measures can be put in place to enhance visibility of cyclists – even then, it should be subject to a sitespecific risk assessment. Closing side streets to motorised traffic is likely to be the only reliable way of dealing with these risks.

Excerpt from the 2014 LCDS.